It took 2 weeks to install our kitchen but only one day to remove it. Here is the area being prepared for the new units. The plumber, joiner and electrician all took their part in removing, re-arraigning and installing new cables and pipe work. When the plumber had finished his work for the day and turned on the water supply our pump that powers our washing water (shower etc) would not start. After a short discussion with the engineer at his base we discovered that the Pump pressure accumulator had lost its air pressure. All that was needed were a few pumps of air from my cycle tyre pump to get the pressure up to 1 bar and we were OK again. We can have a wash tonight, thank goodness!